Hello, I am JC and am making the ce-qual-w2 model for the reservoir in Korea.
Actually, I already made a model and did calibration and validation of the result.
But, one thing makes me curious. CBOD result showed extremely decrease for first short period and then it was to be stable.
In order to solve this problem, I think the model warm-up period would be needed. But I don't know how to do it.
The model ran from 2010 to 2012 with measured data set. I want to have model warm up period of 2 month before the start day.
Is there any solution for the problem?? If you know, please let me know. I would really appreciate it.
Thank you.
Start from early spring